Product No: PFS-80V100A
The PFS-80V100A Automotive Power Fail Simulator | Voltage Micro-interruption Generator is a product that specializes in the testing and production of wire beam interruption (micro-interrupt) testing of the power line and signal line. Simulation power cords and signal cables are interrupted, inserted, and other conditions, and confirm a common evaluation basis.
Standard:
ISO16750-2-2023, IEC 62132-2 , IEC/EN 61000-4-20 , ISO 7637-2,BMW GS 95003-2, Chrylser CS-11979, Fiat 9.90110, Ford EMC-CS-2009.1, GMW 3172, Hyundai Kia ES 95400-10, Hyundai Kia ES 96100-02, IVECO 16-2103, Mack Trucks 606GS15, Mitsubishi ES-X82010, PSA B21 7110, Volvo STD 515-003, Ford FMC 1278, BMW GS 95024-2-2, Jaguar JLR-EMC-CS, Tesla TS-0000425-05.
Application field:
Electrical performance testing of vehicle electronics; it can meet the test requirements of 12V/24V/48V system at the same time.
Technical characteristics:
• Can be controlled by the software
• Can cooperate with (0-80V) DC power supply to achieve test purposes;
• Breaking the waveform time to edit freely;
• High integration dual module combination;
• The signal line module can adapt to high -speed communication;
• The minimum drop time can be set 1µs;
Technical specification:
Interference type | Simulation power cable interruption, short circuit, insertion and other industrial conditions; |
Power cord switch: | |
Power Switch | 2 road switch: -DC+ power cord; -DC-ground wire |
EUT Voltage | ±80V |
EUT Max. Current | 100A |
S2 leakage resistance | Open circuit、0Ω、0.1Ω、1Ω、100Ω |
Current Direction | unidirectional |
Switching time | <200ns |
Rising edge/decrease edge | Realize the upper and lower edges of 200ns under the open circuit |
Peak current | 400 A for 200 ms 1,350 A for 1 ms |
automatic switch-off if I > 1,350 A | |
Interruption time | 1μs~60s |
Calibration parts | Optional |
Signal wire switch: | |
Number of channels | 16 independent channels can be switched to each other |
EUT Power Supply | ±50V DC/5A |
Switching Type | Automatic switch |
Test Mode | Support single roads, multi -road tests at the same time |
Interruption time | 1μs~60s |
Rising/down edge | 100Ω load up and down and also full meet <200ns at the same time |
Safety | Short -circuit protection function |