LED Driver Aging Test Rack
User's Manual
Applicable LISUN models: LEDRACK-1000W48P、LEDRACK-1000W48P-US、LEDRACK-100W192P、LEDRACK-100W192P-US、LEDRACK-300W120P、LEDRACK-300W120P-US、LEDRACK-500W96P、LEDRACK-500W96P-US、LEDRACK-60W240P、LEDRACK-60W240P-US
Below is an image showing the product’s overall appearance. Note: If you have customized the size or features of the aging rack, its appearance may vary slightly.

The computer components are packaged separately. Please install the computer tower, monitor, and other accessories in their respective slots on the burn-in rack. Connect them as shown in the two figures below.


Connect the power cord for the aging rack at the top, as shown in the figure.
See the figure below. The left-hand side (A, B, C, N) provides power to the samples. Since the aging rack has a relatively high power consumption, three-phase power is used to reduce the load on the wiring. If you only have single-phase power and all samples use the same input voltage, you’ll need to use sufficiently thick wiring to short-circuit the three phases (A, B, C) together and supply power directly from a single phase. The supply voltage for the samples should match the voltage of the samples you are connecting. On the
right, L and N provide power to the equipment; the equipment requires only a single-phase 220V power supply.
GND is the ground wire; please ensure the equipment is properly grounded.
Note: When the unit is shipped from the factory, the sample power supply and the unit’s power supply may be short-circuited with a wire. If the sample and unit have the same voltage, they can share the same power cord. When using the unit, you may decide how to connect the power cords at both points based on your specific circumstances.


Note: If your aging rack is custom-built—for example, one capable of heating up to 80 degrees Celsius—the heating module requires three-phase power. See the figure below. In this case, the equipment must be connected to a three-phase power source.

For specific details, please check the power terminals on your device. If you have any questions, please feel free to contact us.
1. System Usage
Install the sample driver as shown in the diagram below. Connect the AC input of the LED driver to the terminal marked = 1 * GB3① on the aging rack. Connect the DC output of the LED driver to the terminal marked = 2 * GB3② on the aging rack.

= 1 * GB3① is the main power switch for the aging rack. Turn on the main power switch. = 2 * GB3② is the individual power switch for each level of the aging rack. Turn on the power switch for the desired level. = 3 * GB3③ is the power switch for other equipment on the aging rack, such as computers. Turn on this switch. Then turn on the computer.

Open the aging rack software. Open System Settings.
Device Port Settings:
Test Results Save Location:



Create a new test project:
There are two types of tests: output tests and switching tests. For output tests, configure the total test duration, load mode and parameters, upper and lower limit values, and so on.
For switching tests, configure the corresponding switching times.
From this screen, you can save a test project file or open a previously saved test project file.



Click the “Test” button on the right side of the software interface to begin the test. The status of each sample station on the interface is indicated by color.

Packing List
| 1 | Aging Rack | 1 |
| 2 | Computers and Related Accessories | 1 |
| 3 | CD (includes a digital user manual, warranty card, certificates, etc.) | 1 |
Photometric, Colorimetric, and Safety Performance Testing Solutions for LEDs
Goniophotometer System: LSG-6000, LSG-1890B, or LSG-1800ACCD
Spectroradiometer & Integrating Sphere Test System: LPCE-2 or LPCE-3
LED Life Maintains a Test System in Accordance with LM-84: LEDLM-84PL
Photobiological Radiation Safety Test System: EN 62471-C or EN 62471-P
Lamp Start, Run-up Time, and Flicker Test System: LSRF-3 and LSP-500VARC-Pst
LED Power Driver Testers: LS2090, M9822, and LSP-500VARC
IK Level Tester | Spring Hammer Impact Tester: IK07-10, IK01-06
Electrodynamic Vibration Generator System: LVD-100KG-6D
Electrical Safety Testers: LS9955, ZRS-3H, ZY-3, TTC-1
Environmental Chamber Test Solution for LED Luminaires
Waterproof Test for IPX5 and IPX6: JL-56
Dustproof Testing Machine for IP5X and IP6X: SC-015
High- and Low-Temperature and Humidity Chamber: GDJS-015B
Salt Spray Test Machine: YWX/Q-010
UV Lamp Aging Test Chamber: UV-263LS
Xenon Lamp Aging Test Chamber: XD-80LS
Ozone Test Chamber: OTC-150A
Sulfur Dioxide Test Chamber: SQ-010
EMC and EMI Test Solutions for CFL and LED Luminaires
EMI Test System: EMI-9KB or EMI-9KA
Electrostatic Discharge Simulator: ESD61000-2
EFT Immunity Measurement: EFT61000-4
Surge Generator: SG61000-5
Voltage Dips and Interruptions Generator: CSS61000-11
Ring Wave Generator: RWG61000-12

www. Lisungroup.com
Patents Filed
All Rights Reserved by Lisun Group
Subject to Change Without Notice

中文简体